Bilming Elevated Railway
Elevated railway running in a circular pattern around Bilming, some sections unfinished, with large operational swaths.
The Bilming Elevated Railway first appears in The Lost Metal as an ambitious infrastructure project encircling the city in a grand loop. Though still under construction in places, large operational sections already serve as both a practical transit system and a potent symbol of Bilming’s industrial might and forward-looking identity.
History
The Lost Metal (The Mistborn Saga)
Elevated railway running in a circular pattern around Bilming, some sections unfinished, with large operational swaths.
Book Appearances
The Lost Metal (The Mistborn Saga)
First appears Ch 22